Provided construction support and inspection services for the Central Parkway Overcrossing Project which consists of the construction of two bridge structures over Byron Road and a UPRR track. The scope of work for Inspection Services included construction monitoring and inspection of all bridge-related work (CIDH construction and precast piling fabrication, falsework, reinforcement, formwork, concrete placement and post-tensioning), and performing material sampling and testing. Project scope also included providing source inspection of specialty items, off-site inspection of materials, oversight of field surveying, and verification of the final deck surface for smoothness and texture requirements. The project was constructed to Caltrans specifications and was conferred to the Mountain House Community Services District.