The Santa Clara Valley Transportation Authority proposed and constructed an 83-foot long undercrossing to serve as a connection to a new Caltrain station platform, extending the undercrossing that was currently being constructed by Caltrans. Biggs Cardosa was selected to provide project management and structural design for a 35% level PS&E which included a preliminary engineering report, 35% plans, a preliminary cost estimate, a preliminary construction schedule, and support services in coordination with UPRR. Under a separate contract, Biggs Cardosa was selected to lead a multi-disciplined team to provide a complete PS&E package and technical support for the successful construction of the PUC extension. This project was received the 2018 ACEC GOLDEN STATE AWARD and 2018 APWA Project of the Year Award.