Home

About Us

Services

Projects

Careers

Offices

Bradley Moody Memorial Underpass

 

Bradley Moody Memorial Underpass

The project consists of a feasibility study and design for a grade separation structure to separate railroad traffic from vehicular traffic. Biggs Cardosa provided railroad coordination support and structural engineering services for the feasibility studies on six undercrossing and overcrossing alternatives at various site locations in the area. An undercrossing alternative along Marina Bay Parkway was the preferred alternative. The proposed grade separation consists of a 900-foot long by 75-foot wide depressed roadway crossing under a single RPRC/BNSF track.  This Project received an Honorable Mention Award from CMAA in the Category of Transportation for projects with a construction cost greater than $10 M.

 

LOCATION
Richmond, CA

 

Transportation - Heavy Rail Projects