Biggs Cardosa is acting as the Stations Segment Structures Lead for the BART Extension to San Jose contract (SVBX Project). The project consists of Preliminary Engineering for passenger stations and associated ancillary facilities for a 10-mile BART extension through developed areas between Fremont and San Jose. The project includes design of three elevated platform stations and four below ground stations integrated with the line and tunnel segments’ structures. Additional structures include three pedestrian access bridges and two roadway bridges over BART. Rendering courtesy of VBN Architects.